Nine modules, one engine. Every asset governed, assessed and proven, everyEvery finding driven to an action, every action taking risk down.
Governance · 4 controls apply to PLC-07 · Compressor train B
Risk by site, cluster and asset class, with every figure traced to a real asset and a real piece of proof.

Command. Every site on one board, ranked by risk and backed by proof.
Controllers outlive their vendor support.
Every asset carries its lifecycle state and vendor support status. Anything that cannot be upgraded is covered by a formal deviation with compensating controls, and the deviation expires on schedule.
Each asset gets its own statement of applicability. A control for a PLC is not a control for a historian.

One OT-native register from SCADA servers to safety systems, with an accountable owner and a custodian for each.
Risk decisions made without any view of plant-floor reality.

No agents, no scans and no data pulled from Level 3 and below. Teams assess equipment where it is and record the result at Level 4.
Engineers, operators and managers on site use any browser on the Level 4 network. No new firewall rules toward the control network.
A separate database for every tenant. RSA-4096 licence validated offline, so no internet connection is needed.
Agents draft findings and answer posture questions. Humans still decide.
Then take the narrated briefing: fifteen stations, about eight minutes. Open any station on its own.
Built to run. Industrial control systems are built to run for thirty years. Their security was never designed to last that long.
Nothing is installed on controllers and nothing scans the network. Your teams assess where the equipment is, and OTMATIX records the result, the evidence and its expiry.

A walkthrough built around your sites, your asset classes and the standards you answer to.

Delivered by the OT security team at OT Associates, pure play OT security.
May we use first-party analytics to learn which pages are useful? It stays off unless you allow it. We use no advertising or third-party tracking cookies. Privacy notice